Notice of Decommissioning and Removal of Play Structure

August 27, 2026

The Town of Bentley would like to advise residents that Mayor and Council approved the decommissioning and removal of the wooden play structure located at 4918 50 avenue (Oxford Park) during the August 25, 2026, Regular Council Meeting.

The Town’s Public Works Department is scheduled to complete the removal of the structure on September 8 and 9, 2026. During this work, the park will be closed to the public to allow the work to be completed safely.

Why is the structure being removed?

The decision follows as assessment of the existing wooden playground structure that identified a number of deficiencies when measured against applicable Canadian Standards Association (CSA) playground safety requirements. The deficiencies identified include concerns related to:

  • Elevated swing rings that exceed the recommended height and spacing requirements;
  • The track slide handgrip is positioned above the applicable height range;
  • The slide slope exceeds the applicable ratio;
  • Rigid openings that fall within dimensions associated with potential child entrapment hazards

While some individual deficiencies may be addressed through repairs or modifications, the number and nature of the deficiencies identified on the structure create broader safety concerns. After considering the current condition, age, ongoing maintenance requirements, and potential cost associated with remediation, Council has determined that decommissioning and removal was the appropriate course of action.

Will the structure be replaced?

 Yes, Mayor and Council recognize the importance of providing safe and accessible recreational spaces for local families and have directed Administration to purchase an appropriate replacement structure, with a tentative installation timeline of Spring 2027.

Residents are asked to please stay clear of the work area while the removal is underway and to follow any temporary signage or barricades that are in place.

The Town appreciates the community’s understanding and cooperation while this work is completed.